EQWATER

21 rue Bara
92130 Issy-les-Moulineaux

France

The building EQWATER in the Seine Ouest district is visible from the ring road and has been designed to accommodate a head office.

EQWATER and the High Environmental Quality Approach (HQE)

Some of the Eqwater programme's HQE targets:
The quest for highly efficient, easily maintained building systems is a source of future savings.

The building's relationship with its immediate environment:

  • Optimised orientation of spaces according to external constraints (climatic, acoustic)


Energy management:

  • Implementation of highly efficient energy solutions
    • Adjustment of lighting near the façades according to the amount of natural light
    • Use of solar energy to produce domestic hot water

Water management:

  • Implementation of water-saving solutions
    • Recovery of rainwater to water green areas.

Maintenance, sustainability of environmental performance:

  • Building management systems help to simplify maintenance operations, especially for:
    • heating and cooling systems
    • ventilation systems
    • lighting systems

Acoustic comfort:
Ensuring that future users enjoy optimum conditions of hearing and intelligibility, thus improving living and working conditions on the premises.

Visual comfort:

Maintaining satisfactory lighting

  • Window blind systems to guarantee the best compromise between light and heat
  • Optimised proportion of glass surfaces according to the orientation of the façades

Caractéristiques

Surface area :  • 15 900 m².
- 14 500 m² of offices
- 1 400 m² for services (canteen, cafeteria,...).
• 208 car park spaces on 2 basement levels. 12 motorbike parking spaces. 42 bike parking spaces.

Nature of operation : 

High-quality services on eight superstructure levels and two infrastructure levels:

• Open floor plate of approximately 2,000 m².
• Head room of 2.70 m under false ceiling.
• Raised floor with plenum space of at least 10 cm.
• Acoustic attenuation of 38 dB on the facades.
• Natural light: glazing with a solar factor of 25 % and light transmittance of at least 45%.
• Ceiling-mounted variable-speed fan coil unit, ductable two pipe, two wire system, dual-flow ventilation
• Air conditioning controlled by BMS.
• Lifts: 1 bank of 4 lifts.
• 2 goods lifts: capacity of 1,600 kg. Breaking load at ground floor for car park lifts.
• Solar sensors on 5th façade for domestic hot water.


Capacity :  1,200 employees
Delivery :  march 2010
Architect :  Arquitectonica
Buyer :  Deka Immobilien GmbH
User :  Marketing in progress.
Type of project :  Sale with delivery upon completion